MP: First Train Reaches Narsinghgarh After a 25-Year Wait: Successful Speed Trial Completed on 13 km Track
Narsinghgarh: Residents of Narsinghgarh witnessed a historic moment as a train arrived in the city for the first time, following a successful speed trial on the 13 km-long Sonkatch-Narsinghgarh section of the long-awaited Ramganj Mandi-Bhopal railway line.
The trial brought a wave of joy to the city, where people had been awaiting rail service for nearly 25 years. A large number of local residents gathered at the railway station to witness the arrival of the train.
Railway Commissioner Gurprakash Singh, who arrived from Mumbai with his team for an inspection by the 'Commission of Railway Safety' (CRS), reviewed the construction work, railway documentation, track condition, and signaling systems. He also issued instructions to officials regarding necessary improvements. Subsequently, the team inspected the entire 13 km stretch via a trolley, verifying technical arrangements and safety standards.
The inspection program commenced with a traditional havan and prayers. Officials also planted saplings, reaffirming their commitment to environmental conservation.
Many Works Still Pending
However, several tasks remain incomplete. These include the electrification of the track, the provision of power supply for the Khilchipur-Rajgarh-Ghatoli section, and various civil works in the vicinity of Rajgarh, Biaora, and Narsinghgarh.
Railway officials have expressed confidence that regular train services on this route could commence by the end of March 2027. Local residents have welcomed the successful trial, viewing it as an encouraging step toward the realization of a long-cherished dream.
