Breaking

15 May 2020

First Engine Dispatched In Lockdown By CLW

News has been coming in from West Bengal from Chittaranjan locomotive works (CLW).

From here first loco engine of 2020-2021 has been dispatched today.  Since this workshop was closed in the lockdown period so till now there have been no production in this workshop.  

Now first engine has been completed and has been dispatched today in the lock down period.  As this workshop had started working with the limited staff on 11th May with the gap of 49 days.

This engine was prepared within 3 days of the resumption of work in the workshop.


No comments:

Post a Comment

Pages