Breaking

30 Sept 2023

Madhya Pradesh: Indore Comes A Long Way From Tempo To Metro; CM Shivraj Said Metro Train Will Be Extended Upto Pithampur, Ujjain



Indore: A new golden chapter has been added to the history of public transport service of Madhya Pradesh from Indore. Chief Minister Shivraj Singh Chouhan flagged off the state's first metro train trial train in Indore on Saturday. Metro Rail Corporation MD Manish Singh welcomed the CM by presenting him a model of the metro train.

The Chief Minister announced that metro train will be extended upto Pithampur and Ujjain. It is State’s resolve that in the Simhastha of 2028, devotees and common citizens will go to Indore by metro to have darshan of Mahakal Baba. Indore and surrounding areas will be designated as metropolitan authority.

Chouhan had a ride in the metro train. He took stock of the arrangements and facilities. Many public representatives and senior officials and other distinguished citizens of the city were also present.

7 lakh passengers will be able to travel daily


With the completion of the world class Indore Metro Train Project in Indore at a cost of Rs 7500 crore, citizens will be provided with the facility of fast, safe, modern and comfortable travel. As many as 7 lakh passengers will be able to commute daily. It will have three coaches. The speed of the metro train will be 90 kilometers per hour.

Addressing the program, Chouhan said that a new era is beginning in Indore. Indore is the city of my dreams, Indore is the cleanest city, Indore is smart city. It is IT city. Indore has come a long way from tempo to metro.


The Chief Minister congratulated Metro Train Corporation's MD Manish Singh and his team. He said that the Metro team has worked on a war footing. He said that people will be able to commute in the metro in a clean and hygienic environment and will be able to reach the destination in a very short time. 


Metro coaches will be air conditioned


Metro coaches will be air conditioned. There will be suitable space for disabled people also.

Each coach of the metro train will have space for 50 people to sit and 300 people to stand. This metro service will be available in more than 31 km area. It will have 28 stations. Out of which 7 will be underground and 21 will be elevated stations.

Automatic ticketing


There will be a system of automatic ticketing on National Common Mobility Card. The doors will also be automatic. There will be a passenger information display system. There will be grab handle, lift, escalator, customer care centre, announcement in Hindi and English, wheelchair for disabled, other public facilities etc.

Solar energy arrangements


There will also be a provision for emergency contact and emergency door in the train. To reduce electricity consumption, solar energy arrangements are being made at stations and depots. This train will be operated by Madhya Pradesh Metro Rail Corporation Limited.

 


CM Shivraj rode the metro

 
CM Shivraj rode the metro today after the flag off. Sitting in the metro train, he took stock of the arrangements and facilities. The metro train started from Gandhi Nagar station and reached the next station on the Super Corridor where the CM received greetings from the citizens.

Citizens Enjoyed History Being Made


People from every section of the society were present to witness the historic movement. There was an atmosphere of immense excitement and enthusiasm.

Officials from education, industry, social, religious, business and other organizations, institutions and associations were present.

Indore Metro construction completed in record time


•    The construction of the 6.3 km long metro viaduct was completed in just 484 days, including 2 monsoon seasons. The track laying was completed in 4 months.
 

•    Construction of 3 track turnouts has been completed in just 27 days, which is a record in the country.
 

•    3 turnouts of the track were electrified in 8 days. Construction of metro rail coach completed in just 5 months after design approval. The entire work of traction third rail system was completed in just 45 days. 4 escalators were installed in 23 days.

About Indore Metro


Yellow Ring Line will connect - Gandhi Nagar, Bhanwar Sala Square, Vijay Nagar Square, Khajrana Square, Bengali Square, Railway Station, Rajwada, Bada Ganpati, Airport and Gandhi Nagar. 

 

In the first phase - Gandhi Nagar to Super Corridor - trial operation of trains is starting on 6.3 km long route between 3 stations. 

 

Residents of Indore and Bhopal will start getting metro facilities on these two tracks from June 2024. The entire work of the metro projects of both the cities will be completed by December 2026.

No comments:

Post a Comment

Pages